The Svoboda/Bull Cattle Company now has a herd of 40 heifers.
(click for larger image)
"The cattle have been grazing hard grass pastures for the last few weeks. We have been moving them everyday to new grass within a pasture. They have been doing well." - Scott
Monday, June 17, 2013
Friday, June 07, 2013
Oyster Report - June 2013
Yesterday I performed some maintenance on my oysters that I over wintered at the SPAT facility at Cedar Beach.
I left Greenport at 9am and culled 4x hanging lanterns of oysters into 5x 4-tier lanterns with 20 oysters per tier. Result: 80+80+80+80+50(smaller oysters in final lantern). There were 24 empty shells. There were two floating cages with 50 oysters/cage - - I just scrubbed the marine growth off the outside of those cages. I took 50 oysters home for eating. I returned to Greenport at noon.
Total 2012 oysters living into 2013 season: 520. (Expected 2013 oysters spats: 1000)
2 hours of labor + 2x :30 minutes travel time = 3 hours.
If I value my labor at $20/hr, then $60/520 = ~$0.12/oyster invested in this maintenance cycle.
Removing my travel time, 4.33 oysters received one minute of my attention (=520/120).
Assuming no improvement in my work flow, 50,000 oysters would require 11,547 minutes (=50000/4.33) of maintenance that equals ~192 hours aka 2.5 weeks of service. This an on-the-cuff reality check of my thoughts to nurture a large number of the bivalves.
I left Greenport at 9am and culled 4x hanging lanterns of oysters into 5x 4-tier lanterns with 20 oysters per tier. Result: 80+80+80+80+50(smaller oysters in final lantern). There were 24 empty shells. There were two floating cages with 50 oysters/cage - - I just scrubbed the marine growth off the outside of those cages. I took 50 oysters home for eating. I returned to Greenport at noon.
Total 2012 oysters living into 2013 season: 520. (Expected 2013 oysters spats: 1000)
2 hours of labor + 2x :30 minutes travel time = 3 hours.
If I value my labor at $20/hr, then $60/520 = ~$0.12/oyster invested in this maintenance cycle.
Removing my travel time, 4.33 oysters received one minute of my attention (=520/120).
Assuming no improvement in my work flow, 50,000 oysters would require 11,547 minutes (=50000/4.33) of maintenance that equals ~192 hours aka 2.5 weeks of service. This an on-the-cuff reality check of my thoughts to nurture a large number of the bivalves.
Subscribe to:
Posts (Atom)